PROJECTS DETAILS

  • Independent Consultant Services for NLEX-SLEX Connector Road Project

Constructions Overview

Detailed Narrative Description of Project:

The project involves an independent consultant that will review the detailed engineering design, monitor the acquisition of basic right of way, review the O&M manual, monitor during construction up to completion, toll collection facilities and other functional required by the client.  The total project length is approximately 8.00 kilometers from NLEX to SLEX consisting of elevated 4-lane tolled expressway, toll plazas, toll operating equipment and safety facilities, two interchanges and operations and maintenance of the entire project.  The project will link the NLEX at C-3 to SLEX via Metro Manila Skyway Stage 3 (MMSS3) near PUP, Sta. Mesa, Manila. 

Detailed Description of Actual Services Provided:

The scope of engineering services includes the following:
  1. Design and Construction of the Project
    1. Assessment of data collection and preliminary analysis
    2. Review of the conceptual design/layout, structures, viaduct/bridge, soil and material surveys, toll equipment and electromechanical design, other elevated structures design and technical specifications.
    3. Certify the approval of detailed engineering design, plans and drawings.
    4. Review of construction bill of quantities, UPA and cost estimates, implementation schedule of the project, quality assurance plans of the concessionaire.
    5. Perform field reconnaissance.
    6. Perform value engineering studies.
    7. Conduct meetings and assist in resolving disputes between concessionaires and DPWH.
    8. Perform organization of administration and monitoring system through reporting and recording system, review of CPM/PERT diagram and concessionaire’s schedules.
    9. Provide progress reports.
    10. Perform quantity control through cost estimate monitoring and checking of variation orders.
    11. Provide inputs on the relocation of existing utilities within the right of way.
    12. Review and recommend to DPWH O&M manual.
    13. Perform contract administration through budget update, assessment of cost variation, final cost of the completion, advise the DPWH about the final cost of completion, issue sectional and final completion certificates and turnover of documents.

Projects Details

Categories: Roads and Bridges Client: NLEX Corporation Date: DECEMBER 2016 - SEPTEMBER 2017 Country: Philippines Location: Manila, Caloocan, Malabon and Navotas, NCR Region: Southeast Asia